News Flash

Home

Posted on: April 11, 2019

I-70: Avon to Vail Roadway Resurfacing

Avon to Vail Roadway Resurfacing

I-70: Avon to Vail Roadway Resurfacing


The Colorado Department of Transportation, in cooperation with United Companies, begins a roadway resurfacing project on I-70 between Avon and West Vail (mile point 167-173.5). Night construction is scheduled to begin the evening of Sunday April 14th and continue through October 2019.

This is a maintenance resurfacing project that will improve the existing surface of the roadway and will include improved surface friction, which can lead to reduced crashes. Additionally, the project will replace all the existing guardrail in the project limits and bring them up to the current standards of crash ratings for guardrail.

The eastbound acceleration lane at Dowd Junction near mile point 171 will be lengthened to provide additional sight distance and merging distance for vehicles using the on ramp. Minor maintenance repairs will also be conducted on the bridge structures in these project limits in association with the resurfacing work. Drainage improvements will also be completed in Dowd Junction to reduce ponding of water on the roadway during storm events.

TRAVEL IMPACTS 

  • General working hours will be from 6:00 p.m.to 6:00 a.m., Sunday through Thursday.
  • No work will be performed Friday and Saturday nights, with the exception of emergency situations.
  • Motorists can expect a single lane closure, both EB and WB I-70 during work hours, with speeds reduced to 40 mph for safety.
  • Temporary slowdowns may be encountered during milling and paving operations to let trucks in and out of the work zone. At the end of each shift, the road will be re-opened to two lanes in each direction. All lane closures and warnings will be posted in advance.

 

Stay Connected

For additional information about this project, call the project information line at 970-661-3883, email the team at I70AvontoVail@yahoo.com, or visit the project website and sign up for updates at https://www.codot.gov/projects/i-70-improvements-between-avon-and-vail.

Facebook Twitter Email

Other News in Home

032A0623

Town of Avon Offices Closed Monday

Posted on: August 29, 2019
970 Avonfest-01

Music Lineup Announced for 970 AvonFest

Posted on: August 28, 2019
DSC_0397

Council Appoints Next Town Manager

Posted on: April 10, 2019
20190108_JDS_AvonTownCouncil_0023

2.15.19 Council Brief

Posted on: February 22, 2019
Avon Comet

Catch the Avon Comet

Posted on: December 21, 2018
2018 TC Election Official Results

2018 Avon Town Council Election Results

Posted on: November 7, 2018

Town of Avon Updates Town Manager Search

Posted on: October 12, 2018

Avon Town Council Candidate Forum Announced

Posted on: September 27, 2018